A SAP calculation for a typical UK project costs from roughly £150 for a simple extension check to £400 or more for a new dwelling, plus VAT, and the final figure depends on floor area, design complexity, how many stages you need and how many identical units you build. That is the market range. The price you actually pay is set by your drawings, so the quickest way to a firm number is to send your plans to a qualified assessor. At Complete EPC we quote SAP calculations for new builds, conversions and extensions across London, and the sections below show you what sits behind the number.
TL;DR
- Published 2026 guides put an extension or glazing trade-off calculation at about £150 to £300 plus VAT, and a single new dwelling at about £200 to £400 plus VAT for design-stage and as-built SAP combined.
- The On Construction EPC, which is issued at completion, is typically a separate line of about £35 to £50 plus VAT per dwelling.
- Floor area, complex design, revisions after the specification changes, and the number of identical plots move the price most.
- Book your assessor once the floor plan and glazing are fixed on paper, not when the window frames are already ordered.
- A SAP calculation is for new dwellings and some building work. An existing home being sold or let needs an EPC, not a full SAP.
Table of Contents
- What a SAP calculation is and why it has a price
- Typical SAP calculation prices in 2026
- What changes the price
- Design stage and as-built: where the second fee comes from
- Timing: the cheapest moment to book
- SAP calculation or EPC: which do you need?
- Other reports that often travel with a SAP
- How to get an accurate quote
- Our approach
- Get your SAP calculation quoted
- FAQ
- Sources
What a SAP calculation is and why it has a price
SAP stands for the Standard Assessment Procedure, the government’s method for rating the energy performance of homes. An assessor builds a model of your building from its drawings and specification: walls, roof, floor, windows, heating, ventilation, hot water and lighting. The model produces the figures Building Control needs to see that the design meets the energy requirements of Part L of the Building Regulations, the part of the regulations that covers saving fuel and power.
You pay for the assessor’s time, their accreditation and the evidence they review. The calculation itself is only one part. A good assessor also tells you where the design fails and what the cheapest fix is, which is often worth more than the report.
In England, the process has two stages. The BRE SAP Conventions describe a design-stage report generated before work begins and an as-built report produced at completion, which reflects any specification changes and is supported by reviewed evidence and photographs. Official guidance reproduced by Babergh Council from the earlier Approved Document L1A shows the same pattern: design calculations and the specification list go in by the day before work starts, and completion calculations reflect the building as constructed. The names and edition numbers of the rules have moved on since, but the two-stage structure is the same one your assessor will follow.

Typical SAP calculation prices in 2026
There is no regulated fee. Assessors set their own prices, and published guides show a consistent pattern. A UK guide published in October 2026 gives these typical assessor fees, all plus VAT:
| Job | Typical fee (plus VAT) |
|---|---|
| Over-glazed extension or fabric trade-off calculation | £150 to £300 |
| Single new dwelling, design-stage and as-built SAP together | £200 to £400 |
| On Construction EPC and lodgement, per dwelling | £35 to £50 |
| Each additional identical plot on a multi-unit scheme | from £30 to £80 |
These are market guide figures, not our prices. Complete EPC does not publish a fixed SAP price, because the correct figure depends on your drawings. London projects often sit towards the upper end of any range, because tight plots, basement conversions, loft extensions and mixed-use buildings tend to be more complex than a standard suburban house. That is a general pattern, so treat it as a reason to send full plans rather than a rule.
Extensions and conversions
A small extension with a lot of glazing is the classic case for a trade-off calculation. The assessor tests whether the proposed windows and fabric meet the target, and if they do not, shows what extra insulation or better glass would bring the design into line. Because the model is smaller, these jobs sit at the lower end of the price table. If you are changing a house into flats, or converting a commercial unit to homes, each dwelling normally needs its own assessment, so the number of units matters as much as the size of the building.
New builds
A single new home needs the full sequence: design-stage SAP, as-built SAP and the completion EPC. Quoting these together is common, and it is worth asking for the whole sequence as one price so you know the total before you start. For a small-to-medium house a typical all-in figure is within the £200 to £400 band above, while larger houses move up.
What changes the price
Five things do most of the work.
- Floor area. More rooms and more elements to model mean more hours. A 250 m² house takes longer than a 90 m² one.
- Design complexity. Bay windows, split levels, mixed wall types, rooflights and projecting sections all add inputs. A simple rectangular box is the cheapest shape to assess.
- Which stages you buy. Design-stage only, as-built only, or both. Both is normal for a new dwelling.
- Revisions. Every time the specification changes after the first calculation, the assessor reruns the model. Changing the heating system, swapping windows or altering insulation thickness after the report is issued is where unplanned costs appear.
- Repeated units. A development of identical houses is cheaper per plot because the modelling can be reused. Different layouts need individual work, which is why the multi-unit fee in the table is quoted per additional identical plot.
A fixed quote tied to a stated specification is the best protection against surprises. Ask what happens to the price if the specification changes, and agree it before work begins.
Design stage and as-built: where the second fee comes from
The first calculation tells you whether the design works on paper. The second confirms that the building you built matches it. The as-built stage needs evidence, and the BRE Conventions list the kind assessors review: construction-layer U-value data (how much heat each wall, floor or roof lets through), window performance evidence, the air-permeability test result in England and Wales, confirmation of the completed specification, thermal-bridging evidence and photographs of construction details.
The practical lesson for your budget is to collect this evidence while the work is happening. Photographing insulation before it is covered, keeping delivery notes for materials and keeping the air-test certificate together saves the assessor chasing you, and saves you paying for delays. A building that fails the air test, or that deviates from the specification, will need its as-built calculation redone.
Timing: the cheapest moment to book
Book your assessor once the floor plan and glazing are fixed on paper, and before frames are on order. Paul Martyn Construction makes this point in its guide: a trade-off calculation can show on the drawing exactly how much extra to spend on insulation or better glass to keep the glazing you want. That turns a possible site problem into a design decision.
The opposite is expensive. If the windows are made and the calculation then fails, your options are replacing glazing, adding insulation after the fact or changing the heating, and each costs far more than the assessment fee.

SAP calculation or EPC: which do you need?
The two are related but not the same, and this is where owners often pay for the wrong thing.
- A new dwelling needs a SAP calculation. The BRE Conventions state that a SAP EPC is issued for a new dwelling at completion.
- An existing home being sold or let with no building work needs an EPC produced by a simpler method called RdSAP (Reduced Data SAP), which is based on a survey of the property rather than on drawings. It does not need a full SAP.
If you are a landlord or owner selling a London home, you need a domestic EPC, not a SAP calculation. Our domestic EPC service covers that. If your property is a shop, office or other commercial building, the equivalent is a commercial EPC, and new commercial buildings use SBEM calculations instead of SAP, which we also provide.
Other reports that often travel with a SAP
Larger or more urban London schemes frequently need more than the SAP itself. Planning authorities may ask for an energy statement for planning, and homes with large glazed areas or tight ventilation may need a TM59 overheating assessment to show they will not become uncomfortably hot in summer. We also carry out Part G water calculations. Asking for these together with the SAP at the outset means one set of drawings, one brief and fewer revisions.
How to get an accurate quote
An assessor can only give you a firm figure from firm information. Send:
- Floor plans, elevations and sections for the building.
- The proposed specification: wall, floor and roof build-ups, window type and glazing, heating system, ventilation and hot water.
- The number of dwellings, and whether any are identical.
- Which stages you need: design, as-built or both, plus the completion EPC.
- Your programme, including when Building Control needs the design calculation.
With this, a quote can state exactly what it covers. Without it, you will get a range that can move.
Our approach
Most of the money wasted on SAP comes from timing, not from the fee. Owners book an assessor after the windows are ordered, then discover the design needs extra insulation or a different heating system. We would rather see your drawings early.
At Complete EPC our qualified assessors prepare SAP calculations for new builds, conversions and extensions across London, and we also handle the related reports that tend to arrive in the same project: Part G water calculations, overheating analysis and energy statements. Having one team cover them keeps your specification consistent from one report to the next.
We back our pricing with a UK lowest-rate guarantee, and we give practical advice on what to change if your design falls short, not just a pass or fail.
Danny
Get your SAP calculation quoted
If you have drawings for a London extension, conversion or new build, our SAP calculation service is the place to start. Our qualified assessors work from your plans and specification, and our pricing comes with a UK lowest-rate guarantee.

Send your plans, tell us which stages you need and we will come back with a quote for your project. Existing-home owners who only need an EPC for a sale or let can start at our domestic EPC page, and the full range of services is on the Complete EPC homepage.
FAQ
How much does a SAP assessment cost in London?
Published 2026 guides put a simple extension calculation at about £150 to £300 plus VAT and a single new dwelling at about £200 to £400 plus VAT for both stages combined. London projects with complex layouts can cost more. The exact figure depends on your drawings, so a quote from your plans is the reliable answer.
Is a SAP calculation the same as an EPC?
No. A SAP calculation models a design from drawings and is needed for new dwellings and some building work. An EPC for an existing home sold or let is usually produced with RdSAP from a survey. A new dwelling also receives an EPC at completion, using its SAP results.
Why do I need two SAP calculations for a new build?
The design-stage calculation shows Building Control that the plans meet the energy requirements before work starts. The as-built calculation reflects what was actually constructed, including specification changes and the air-test result, and supports the completion EPC.
Can I reduce the cost of a SAP calculation?
Yes, mainly through preparation. Send complete drawings and a fixed specification, book before ordering windows, keep construction photographs and the air-test result together, and ask for both stages in one quote. Identical units on a development are also cheaper per plot.